Laserfiche WebLink
RECEIVED <br /> JUL ? 5 ;n•? <br /> _ I-AVIRONNIENTAL HEALTH <br /> ]Ubert <br /> 131 Sc DEPARTh1ENT Z Precautions / Pre-Installation <br /> �Y p <br /> • Risk of electric shock.Always disconnect the pump from the power source before handling or making adjustments. <br /> Installation Manual :III • These pumps are not to be installed In locations classified as hazardous in accordance with the National Electric Code,ANSI/NFPA <br /> 70. <br /> • The electrical connections and wiring for a pump installation should only be made by qualified personnel. <br /> Enr I Pump Systems r • This pump is supplied with a grounding conductor or a grounding-type attachment plug.To reduce the risk of electric shock,be <br /> certain that the grounding conductor is connected only to a properly grounded control panel or,if equipped with a grounding-type <br /> plug,that it is connected to a properly grounded,grounding-type receptacle. <br /> • Do not bypass grounding wires or remove ground prong from attachment plugs. <br /> By definition,an EPS system is a custom product and some differences in materials,pumps,and • Do not remove cord and strain relief,and do not connect conduit to pump. <br /> design are unavoidable. This manual is intended as a generic guideline only. Any specific questions • Do not use an extension cord. <br /> should be directed to Technical Customer Service Department at the Liberty Pumps Factory <br /> (PH:1-800-543-2550,E:suoport(a)libertvpumps.com) • This system requires separate,properly fused and grounded branch circuit. Make sure the power source is properly sized for the <br /> voltage and amperage requirements of the system,as noted on the nameplate. <br /> • The installation must be in accordance with the National Electric Code and all applicable local codes and ordinances. <br /> • Sump and sewage pumps often handle materials which could cause illness or disease. Wear adequate prolective <br /> Common Components: clothing when working on a used pump or piping. <br /> • <br /> Fiberglass Tank Never enter a pump basin after It has been used. Sewage and effluent can emit several gases which are poisonous. <br /> • <br /> • Sump,Effluent,Sewage or Grinder Pump(s) Pre-installation checklist: <br /> • Factory Installed Guide Rail System <br /> 1. Inspect the unit upon arrival to ensure that there Is 4. Check to ensure that your power source is adequate <br /> • Pre-mounted float system no shipping damage. Pay careful attention to the to handle the pump amperage as noted above and on <br /> condiflon of the fiberglass basin,control goats, the pump nameplate.Ensure that the electrical supply <br /> • NEMA 4X Junction Box pump guide rail brackets,and control panel.Notify circuit is equipped with fuses or breakers of the proper <br /> the carries Immediately if there Is any damage. capacity. <br /> • Inlet hub 2. Read all instructions and familiarize yourself with 5. A separate 115V branch circuit should be Installed for <br /> • Control Panel or Alarm System t i�C the unit's operation prior to proceeding with the the control circuit. We do not recommend splitting <br /> installation. the Incoming pump power circuit to power the control <br /> 3. A qualified licensed electrician should install and circuit. <br /> test all electrical circuits. 6. All electrical connections should be tested to ensure <br /> Manual Contents: _ that a proper ground has been established <br /> 1. General Information <br /> 2. Precautions/Pre-Installation <br /> \.. �� 3 Installation Instructions <br /> 3. Installation Instructions 1. Excavation: Excavate the hole for the basin as small as possible,with a minimum base diameter at least 2" <br /> 4. Maintenance&Troubleshooting IMPORTANT: wider than the diameter of the anti-floatation flange. Never place the basin in direct contact with rocks or other <br /> sharp objects.Place enough fine,1/8"to 3/4"pea gravel or 1/8"to 1/2"washed,crushed stone at the bottom of <br /> 5. Guide rail Assembly Prior to installation,record Model,Serial Number,and the excavation to create a minimum of 12 inches stone or gravel after compaction. Do not use sand or native soil <br /> 6. Guidelines for field mounting floats Code Number from pump nameplate for future reference. as backfill*. Properly compact underneath the basin to provide a solid,level base that can support the weight of <br /> MODEL the filled basin. If a concrete pad will be used under the basin,the compacted stone sub-base can be reduced to <br /> 6 inches. <br /> SERIAL 2. Connections&Backfill: Pour enough concrete over and around the anti-floatation flange to anchor the basin <br /> and prevent upward movement.Connect schedule 80 PVC pipe to the pump discharge. Do not Increase the <br /> Iib"r Pumps" CODE discharge piping to a larger size than the pump can handle. The remainder of the discharge line should be as <br /> INSTALLATION short as possible with a minimum number of turns. Connect the inlet line to the inlet hub that was included with <br /> 7000 Apple Tree Avenue DATE the system. Connect the electrical coupling to 2"electrical conduit and run the power and float cords through the <br /> Bergen,NY 14416 conduit to the control panel. The remaining backfill should be only fine,1/8"to 3/4"pea gravel or 1/8"to 112" <br /> Phone:(800)543-2550 washed,crushed stone. Do not use sand or native soil as backfill'. Do Not exert heavy pressure or run heavy <br /> Fax:(585)494.1839 1 equipment over the backfill material,as it may cause tank collapse. <br /> www.libertypumps.com 'Other backfill options may be available—consult the factory for special instructions relative to your situation. <br /> ®Copyright 2016 Liberty Pumps Inc. All rights reserved I CCopyright 2016 Liberty Pumps Inc. All rights reserved 3 <br />