Laserfiche WebLink
.. ...... . .............. <br /> c Make sure fusible Yes No` N/A <br /> element is in place <br /> and..natty <br /> cautioned. <br /> d.Be sure feat ports No" N/A <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.31ntarstitial Check condition of as No' N/A <br /> leak detection equipment,including' <br /> equipment The window is <br /> clean and clear in <br /> sight leak gauges. <br /> The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> cortosion <br /> • Activate the test <br /> button, if <br /> a licable. <br /> 5.4 Spill a.If corrosion, Yes* No N!A <br /> contain i damage,or wear has <br /> boxes on fill compromised the <br /> pipe abiliry of the unit n <br /> perform spill <br /> containment functions, <br /> re lace the unit. <br /> b.Inspect the Yes Na N!A <br /> connections to the <br /> AST Por tightness, as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> If nacessa <br /> c.Drain valves must Yes' No N/ <br /> be operable and <br /> closed <br /> 5.55trainer a.Checkthattne YesNo' N/A <br /> strainer is clean and In <br /> cad Condition. <br /> AST INSPE07ION STANDARD SEPTEMBER 2011 <br /> COPYRIGHT@ 2011 Steel Tank Institute <br />