Laserfiche WebLink
30703 MacArthur Drive PR0515652 <br /> July 26, 2019 Program: APSA <br /> PHOTO 2: SPCC plan indicates that T5-T8 are double walled tanks and they were single walled tanks. <br /> c <br /> Nl -on is accountable for oil spill prevention: , <br /> N ? <br /> Michael Repetto, President ���aaer <br /> 24 hr. Mobile Telephone: (209) 815-1158 <br /> 00 AST�. <br /> 2.6 Petroleum Storage InformationE <br /> The Facility has thirteen aboveground bulk storage tanks (ASTs) and several portable <br /> containers which are summarized in Table 2-1. <br /> row <br /> Table 2-1 <br /> Bulk Storage Container Information <br /> AST/ Average Daily <br /> ID Drum/ Capacity Con4steel <br /> nstallation Throughput <br /> No. Location Container (gallons) Contents MDate (gallons) <br /> sc <br /> T-1 Parking AST 10.000 Clear Diesel Dou5/1995 <br /> T-2 Parking AST 2,000 Red-dyeDiesel Double-walled 5/1995 <br /> steel <br /> Unleaded Double-walled <br /> T-3a Parking AST 750 gasoline steel 6/2008 }R <br /> T-3b Parking AST 250 Unleaded Double-walled 6/2008 <br /> gasoline steel <br /> T-4 Shop AST 1,500 Used oil Double-walled 5/1995 15 <br /> steel <br /> T-5 Shop AST 250 Motor oil Double-walled 5/1995 6 <br /> steel <br /> T-6 Shop AST 250 Hydraulic Oil Double-walled 5/1995 9 <br /> steel <br /> T-7 ::Shop AST 250 Hydraulic Oil Double-walled steel 5/1995 9 <br /> T-8 Shop AST 250 Transmission fluid Double-walled steel 5/1995 5 <br /> May 2016 2-*tic <br /> I <br /> Lydia Baker, REHS Page 2 of 11 <br />