Laserfiche WebLink
Commems <br /> Formal Inspection Is Required in(years): <br /> The tank is equipped with spill control and/or CRDM(continuous <br /> release detection method)and is considered a Category 1 tank per <br /> table 5.5 of STI SP001.The next formal inspection would be required <br /> Formal Inspection Is Required in(years): n 20 years or as required by the sites SPCC Plan.The inspection <br /> schedule is based on the site completing the recommended repairs <br /> as noted in the inspection report. If problems are identified during <br /> periodic inspections a formal inspection may required soon.The <br /> condition of the equipment may change after the issuance of this <br /> report. <br /> ,Other <br /> 7 <br />