My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19400
>
2800 - Aboveground Petroleum Storage Program
>
PR0536577
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:55:56 PM
Creation date
7/31/2019 1:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536577
PE
2832
FACILITY_ID
FA0003748
FACILITY_NAME
J S G TRUCKING COMPANY
STREET_NUMBER
19400
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01322033
CURRENT_STATUS
01
SITE_LOCATION
19400 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Received on 11/04/2019 <br /> SJC EHD - CR <br /> Spill Prevention,Control,and Countermeasures Plan l��rr�eon <br /> JSG Trucking Company.Acampo, CA <br /> October 29, 2019.Teracon Project No. NA187064 <br /> vicinity of the project at the time it was prepared. The limitations of this SPCC Plan should be <br /> recognized as the Client formulates conclusions on spill control measures at the facility. <br /> The development of the SPCC Plan relied primarily upon readily available information,verbal and <br /> written reports of others, and visual observations. The SPCC Plan is based on conditions and <br /> equipment at the facility at the time of the site visit. Terrsoon is not responsible for changes to <br /> systems and operations occurring after the site visit that may affect the SPCC Plan, Teracon Is <br /> also not responsible for the implementation and upkeep of the SPCC Plan or for addressing <br /> potential concems. Teracon's review of the Facility's programs is not intended to evaluate the <br /> adequacy of the program as it pertains to other requirements (i.e., National Fire Protection <br /> Association requirements and the EPA's Underground Storage Tank regulation). Terracon does <br /> not warrant the work of third parties supplying information,which may have been used during the - <br /> preparation of this report. <br /> Teracon accepts no responsibility or liability to any person or organization for any claim, for loss <br /> or damage (including attorney's fees)caused, or believed to be caused, directly or Indirectly by <br /> conditions revealed or not revealed by the SPCC Plan,fines levied by regulatory agendas, and/or <br /> releases or spills of oils. No warranties, express or implied, are intended or made. <br /> If you have comments or questions, please call (209)367-3701. <br /> Sincerely, <br /> TERRACON CONSULTANTS, INC. <br /> n � <br /> zv- <br /> Tamara K.Woods, B.Sc. Ne' O. Anderson, P.E. 44619 <br /> Staff Scientist P cipal Engineer <br /> Responsive. Resourceful • Reliable III <br />
The URL can be used to link to this page
Your browser does not support the video tag.