My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7200
>
3500 - Local Oversight Program
>
PR0544721
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:03:27 AM
Creation date
8/1/2019 9:47:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544721
PE
3528
FACILITY_ID
FA0000104
FACILITY_NAME
QUICK N SAVE*
STREET_NUMBER
7200
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19316002
CURRENT_STATUS
02
SITE_LOCATION
7200 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w � ' <br /> 31 March 2004 <br /> AGE-NC Project No. 06-1156 <br /> Page 7 of 8 <br /> tremmie pipe.The SJCEHD will be notified for grout inspection at least 48-hours prior to conducting <br /> grouting procedures. <br /> Following completion of the monitoring wells,well elevations and locations will be surveyed by a <br /> California-licensed surveyor. <br /> 4.5. WELL DEVELOPMENT <br /> Development will consist of a combination of bailing to remove the major portion of fine-grained <br /> sediment from inside the well, surging to flush out or draw in sediment from the filter pack, and <br /> additional bailing to finish the removal of sediment. Development activities will be continued until <br /> field parameter(pH, electrical conductivity, and temperature)readings have stabilized and ground <br /> water is essentially sediment-free. <br /> 4.6. GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with pertinent applicable sampling <br /> protocols, details of which are presented below. <br /> 4.6.1. Static Water Level Measurements <br /> Before sampling and during groundwater monitoring, static water level will be measured using an <br /> electric water level indicator. Water level data will be recorded to the nearest 0.01 foot from a <br /> reference point marked of the top of the PVC well casing. Before and after each use, the <br /> measurement device will be rinsed with water. <br /> 4.6.2. Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling, the well will be purged using <br /> a Waterra inertia pump, submersible pump or a disposable bailer, to ensure that the sample is <br /> representative of the formation,rather than water standing in the well casing.The well will be purged <br /> until: 1)a minimum of three casing volumes is removed from the well; and/or 2)the field-measured <br /> ground water parameters have stabilized. However, if a well is purged dry prior to evacuating three <br /> casing volumes, a ground water sample will be collected following 80 percent recovery of ground <br /> water within the well or within 8-hours of well evacuation. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.