My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:18:09 AM
Creation date
8/1/2019 10:06:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> �I <br /> August 6, 2014 <br /> Page 5 of 10 <br /> p Reference: Well Destruction Work Plan ARCO No. 2130 <br /> 4 Limitations <br /> This report was prepared in accordance with the scope of work outlined in Sfantec 's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the Site. It was <br /> prepared for the exclusive use of ARC for the express purpose stated above. Any re-use of this <br /> report for a different purpose or by others not identified above shall be at the user's sole risk <br /> without liability to Stantec, To the extent that this report is based on information provided to <br /> Stantec by third parties, Stantec may have made efforts to verify this third party information, but <br /> Stantec cannot guarantee the completeness or accuracy of this information. The opinions <br /> expressed and data collected are based on the conditions of the Site existing at the time of the <br /> field investigation. No other warranties, expressed or implied are made by Stantec, <br /> Prepared by: ^TReviewed by: 'OIt <br /> , <br /> tictorila Blanchard Brian Westhoff, P.G. <br /> Geologic Staff Senior Geologist r <br /> rF <br /> August 6, 2014 <br /> cc: Mr. Sergio Morescalchi, ARC, a BP Affiliated Company (upload to Enfos) <br /> Mr. James Barton, California Regional Water Quality Control Board — Central Valley Region <br /> Upload to Geoiracker <br /> Attachments <br /> Table 1 Well Construction and Proposed Well Destruction Details <br /> Figure 1 Site Plan <br /> Figure 2 Site Plan with Utilities <br /> Figure 3 Detailed Site Utility Plan <br /> Attachment A SJCEHD Letter dated August 23, 2013 <br /> Attachment B Bore Logs <br /> Attachment C Diagram of Wells with Proposed Destruction Method <br /> Design with community In mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.