My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:18:09 AM
Creation date
8/1/2019 10:06:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 4 <br /> Sal Boring and Well Completion Details <br /> ARCO Service Station No, 2130 <br /> 7906 North EI Dorado Street <br /> Stockton California <br /> Boring Well Screen Well Screen Slot <br /> Well Installation Depth Diameter Top Bottom Length Size Comments <br /> I.O. Date feet b s inches feet b s) (feet b s) (feet) inches <br /> Monitoring Wells <br /> MW-1 12/16/1991 75 4 60 75 15 0.02 Monitoring Well <br /> MW-2 12/18/1991 75 4 60 75 15 0. 1 Monitoring Well <br /> MW-3 12/19/1991 75 4 60 75 15 0.02 Monitoring Well <br /> MW-4 8/13/1992 75 4 55 75 20 0.02 Monitoring Well <br /> MW-5 8/20/1992 78 4 58 78 20 0.02 Monitoring Well <br /> MWS 11/16/1992 74 2 59 74 15 0.02 Monitoring Well <br /> MW-7 11/17/1992 73 2 53 73 20 0.02 Monitoring Well <br /> MW-8 11 /4/1993 76 2 56 76 20 0.02 Well Destroyed 1996 <br /> MW-9 11 /5/1993 73 2 53 73 20 0.02 Well Destroyed <br /> MW-10 11/13/1993 73 2 53 73 20 0.02 Well Destroyed <br /> MW-11 7/6/2006 50 2 30 50 20 0.02 Monitoring Well <br /> MW-12 7/6/2006 50 2 30 50 20 0.02 Monitoring Well <br /> MW-13 7/5/2006 50 2 30 50 20 1 .02 Monitorinq Well <br /> Remedial Wells <br /> VW-1 12/17/1991 65 4 45 65 20 0. 1 Vapor Extraction Wells <br /> VW-2 12/17/1991 64 4 29 64 35 0.1 Vapor Extraction Wells <br /> VW-3 12/18/1991 65 4 40 65 25 0.1 Vapor Extraction Wells <br /> VW-4 12/18/1991 65 4 40 65 25 0. 1 Vapor Extraction Wells <br /> VW-5 8/14/1992 51 4 35 51 16 0. 1 Vapor Extraction Wells <br /> VW-6 8/17/1992 40 4 15 40 25 0. 1 Vapor Extraction Wells <br /> VW-7 8/18/1992 60 4 35 60 25 0. 1 Vapor Extraction Wells <br /> VW-8 8/18/1992 60 4 40 60 20 0. 1 Vapor Extraction Wells <br /> VW-9 8/18/1992 40 4 15 40 25 0.1 Vapor Extraction Wells <br /> VW-10 8/19/1992 60 4 30 60 30 0.1 Vapor Extraction Wells <br /> VW-11 8/11 /1995 69.5 4 44.8 54.5 9.7 0.1 Vapor Extraction Wells <br /> VW-12 8/11 /1995 64.3 4 45.4 55 9.6 0.1 Vapor Extraction Wells <br /> AS-1 8/25/1992 61 2 60 61 1 0.02 Vapor Extraction Wells <br /> 73 2 71 73 2 0.02 <br /> AS-2 8/10/1995 75.5 2 73.3 75.3 2 0.02 Sparge Point (Air Sparge Well) <br /> AS-3 8/10/1995 76.8 2 74.8 76.8 2 0.02 Sparge Point (Air Sparge Well) <br /> MS-1 8/25/1992 61 2 60 61 1 0.02 Muli-Level Sparge Point (Air Sparge Well) <br /> 70 2 65 70 5 0.02 Muli-Level Sparge Point (Air Sparge Well) <br /> MS-2 8/26/1992 61 2 60 61 1 0.02 Muli-Level Sparge Point (Air Sparge Well) <br /> 70 2 65 70 5 0.02 Muli-Level Sparge Point (Air Sparge Well) <br /> MS-3 8/26/1992 61 2 60 61 1 0.02 Muli-Level Sparge Point (Air Sparge Well) <br /> 70 2 65 70 5 0.02 Muli-Level Sparge Point (Air Sparge Well) <br /> Fxnlanation <br /> All wells are of PVC construction <br /> bgs = Below Ground Surface <br /> - = Soil Boring only, no well casing installed <br /> 2130 WellConDds Table 4 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.