Laserfiche WebLink
I� <br /> San Joaquin County <br /> oP" " ` " Environmental Health Department dtFe-eroR <br /> Donna Heran, REHS <br /> 1868 East Hazelton Avenue <br /> Stockton , California 95205-6232 PROGRAM cookorNAroas <br /> •, ? ' Robert McClellan, REHS <br /> _ Jeff CarrueSCo, REHS, RDI <br /> a`p. > WelaSide : WWWSJL�OV. OYG/ehr/ Kasey Foley, REHS <br /> C Foa Phone : 209 468-3420 Linda yEstr Estrada, <br /> ( � Rodney Estrada, REHS <br /> Fax : (209) 464-0 '138 Adrienne Ellsaesser, REHS <br /> September 18, 2014 <br /> Atlantic Richfield Company Volpi Family I LP <br /> Mr. Sergio Morescalchi C/O Nancee L. Volpi <br /> PO Box 1257 4719 Quail Lakes Dr. STE G # 336 <br /> San Ramon , CA 94583 Stockton , CA 95219 <br /> Subject: ARCO #2130 <br /> 7906 N . EI Dorado Street <br /> Stockton, CA 95210 <br /> The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br /> Well Destruction Work Plan, dated 6 August 2014, prepared and submitted by your consulting <br /> firm , Stantec Consulting Services, Inc. (Stantec) , on your behalf for the above-referenced site. <br /> In the work plan, Stantec proposes to destroy monitoring wells MW-7, MW-14, MW-19, and <br /> MW-21 by pressure grouting. For these four wells, Stantec proposes to fill the well and filter <br /> pack with neat cement through a tremie pipe from total depth to the top of the well casing , allow <br /> the grout to settle and then top off the grout before applying 25 pounds per square inch (psi) of <br /> pressure for ten minutes. After pressure grouting, the top 3 feet of the well boring will be cleared <br /> with an airknife, creating a hole at least one foot larger in diameter than the original auger used <br /> to install the well . The well casing is to be removed from 2 . 5 feet below ground surface (bgs) to <br /> grade and a grout sealant mushroom cap installed to 2 feet bgs. <br /> Stantec proposes to destroy an additional 15 wells by pressure grouting following the same <br /> methodology above; however, Stantec requested a variance to install a limited mushroom cap <br /> within the borehole diameter due to subsurface structure and/or utilities. This variance request <br /> was approved by Adrienne Ellsaesser, Program Coordinator. <br /> Stantec proposes to destroy 18 wells by over-drilling as follows: <br /> Air-knife approximately 6 feet 6 inches bgs around the borehole to a diameter of 110 <br /> percent to determine if underground facilities exist in the area to be drilled; <br /> ® Clear the top 3 feet of these wells to a diameter at least one foot larger than the original <br /> borehole diameter to allow for a mushroom cap; <br /> a Over-drill the wells to remove all original materials within the boreholes; <br /> The resulting boreholes backfilled from the bottom up to approximately 3 feet bgs with <br /> neat cement through a tremie pipe; <br /> Top off the grouted wells with a mushroom grout cap. <br />