My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:24:19 AM
Creation date
8/1/2019 10:15:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I } <br /> Stantec <br /> Remediation System Removal j <br /> ARCO Service Station No. 2130 <br /> July 9 , 2010 <br /> PROPOSED SCOPE OF WORK <br /> Rising groundwater levels have caused the screens of the site groundwater monitoring wells <br /> and vapor extraction wells to become partially or fully submerged, and the air sparge blower and <br /> antiquated SVE system are non-functional and do not comply with BP/ARC's Integrity <br /> Management Program. <br /> i <br /> The scope of work includes 1 ) decommissioning the existing above grade portions of the <br /> remediation system, 2) investigating the design and integrity of the sub grade portion of the <br /> system and 3) conducting a site wide utility survey. <br /> i <br /> Decommissioning of the above grade portion will include removal of the SVE manifold, air <br /> sparge compressor, and antiquated SVE system. The existing manifold will be cut off near the j <br /> surface of the concrete pad with an appropriate tool and will be capped . The air sparge <br /> compressor and SVE system will be removed and disposed of by Stantec. The existing <br /> electrical meter panel will be disconnected, secured, and tagged for potential future use. ! <br /> Investigation of the below grade portion will include pressure testing the existing piping to <br /> determine integrity and possible reuse in future remediation activities . Well and vault boxes will <br /> be opened and the existing piping will be documented for future reuse. <br /> i <br /> A site wide utility survey will also be conducted to accurately locate the existing sparge lines and i <br /> provide utility information for future planning purposes. ff <br /> I <br /> SCHEDULE NU 11 �TNiN <br /> Stantec is currently scheduled to perform this work on August 2 and 31 2010. Data collected <br /> during this activity will be used to aid in development of a Feasibility Study that will be submitted <br /> to SJCEHD approximately six weeks after field activities are completed . <br /> i <br /> 2130 Response Letter - Remediation System Removal.doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.