My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:24:19 AM
Creation date
8/1/2019 10:15:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 5 <br /> I <br /> Vicki McCartney [EH] <br /> From : Vicki McCartney [EH] <br /> Sent: Friday , May 02, 2014 12:58 PM <br /> To: 'Westhoff, Brian' <br /> Cc: Gabriel Gonzalez [EH] <br /> Subject: RE: Arco 2130, Stockton Regulatory Response <br /> Good afternoon Brian , <br /> Gabe Gonzalez, the new case worker for ARCO Station No. 2130 at 7906 North EI Dorado Street in Stockton , <br /> and I visited this site on Wednesday, April 30, 2014. 1 have also discussed with Adrienne Ellsaesser, Program <br /> Coordinator, Stantec's proposals for this site submitted in Well Destruction Work Plan. <br /> The following is a list of issues concerning the work plan: <br /> 1 . Under Well Destruction Activities on page 2, second paragraph , AS-2 and AS-3 are listed twice among the <br /> fifteen wells that Stantec proposes to require a variance. <br /> 2. On page 2 of the work plan , Stantec proposes to place a mushroom cap at one foot below surface grade <br /> ((bsg) when pressure grouting MW-5 , MW-6, MW-13, MW-20, AS-2, AS-3, VW-3, VW-6 , VW-8, VW-101 <br /> VWA 1 and MW-3A/B; however, on page 3 of the work plan Stantec proposes to air knife to three feet bsg <br /> and cut off the casing at three feet bsg . There is no mention of a mushroom cap. Stantec does state that <br /> "Given the risks associated with the subsurface structures at MW-6, AS-2, AS-3, VW-3, VW-6 and VW-11 , <br /> Stantec recommends air knifing to approximately one ft bgs, and each well casing will be cut at <br /> approximately one ft bgs. The borehole locations will be backfilled and resurfaced with appropriate <br /> materials to match the existing grade." Again there is no mention of a mushroom cap. <br /> If you propose to pressure grout some of the wells, you must include forming a mushroom cap. Cutting off the <br /> casing at one foot bsg will not be deep enough to form a one-foot mushroom cap, with grout six inches below and <br /> six inches above the cut-off casing. I suggest that you propose hand digging to two feet bsg , cut off the casing at <br /> 1 .5 feet bsg , form a mushroom cap from two to one foot bsg , and finish off the last foot bsg with appropriate <br /> materials to match the existing grade. <br /> am waiting to hear from Nuel Henderson as to whether MW-14, MW-19 and MW-21 should be pressure grouted <br /> or over-drilled. Since diesel was found in soil when installing these three wells, I believe that these wells should <br /> be over-drilled. Once Nuel has commented about these three wells, I will let you know. <br /> In conclusion, our agency will allow variances to pressure grout wells in or near the USTs, product lines, electrical <br /> lines and near the Healy tank. However, the work plan in its current version will not be acceptable and must be <br /> revised . <br /> Please contact me if you have any questions concerning this email. <br /> Thank you Brian . <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Phone: (209) 468-9852 <br /> Email: vmccartneV(a)sicehd .com <br /> 5/2/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.