My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0012685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:36:23 PM
Creation date
8/1/2019 10:22:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012685
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rIN <br /> 4 —6FIEl4 P . J_ <br /> *""'�RISNA Company £ll VirpnmP�tat Suluffons <br /> Through Applied Science, <br /> J 164 Gold Camp Drive,Suite 200 Ertrinccri..•A Cuusfruellon <br /> RanchU Cordovs,CA 9Sf„0 <br /> Phone(916)852-6690 <br /> FAX 1910)&;2-6688 <br /> December 6, 1991 <br /> Mr. Mike Infurna <br /> Sar: Joaquin County Public Health Services <br /> Environmental Health Division <br /> P.O. Box 2000 <br /> Stockton, CA 95201 <br /> Subject: 1'eleplrur. Com ersation Regarding Addendum to Work flan for a Subsurface <br /> lttvestig;:: at ARCO Service Station No. 2130, 7906 North EI Dorado <br /> Street, Stockton, California. <br /> c <br /> E <br /> Mr. Infurna: <br /> As we discussed in our telephone conversation of December 4, 1991,we modified the vapor- <br /> well construction to include factory perforated casing with 0.10-inch slots in our Addendum <br /> Y to Work flan dated November 18, 1991. The vapor-extraction well construction discussed <br /> in our original Work Plan dated May 17, 1991 states No. 3 sand will be placed in the <br /> annular place opposite the screen. Pea gravel, not No.3 sand will be placed in the annular <br /> space opposite the screen sections of the vapor-extraction wells for the rr.- - 4 work <br /> scheduled to begin December 16, 1991. Soil borings converted to vapor-eV ills will <br /> be terminated at 10 feet above ground water or when two consecutive su; ..aples with <br /> photoionization d,.tector readings below 50 parts per million by volume are collected below <br /> s <br /> 25 feet below grade. 'f lie screen intervals will be selected according to field evidence of <br /> hydrocarbons in soil from each buring, We also di!cussed that the vapor-extractior test will <br /> i be limited to one day. 1'1case call if you have any questions regarding this letter or our <br /> Addendum to our Work Plan. <br /> 6 <br /> Sincerely, <br /> RESNA Industries <br /> Eloise F. Cherven <br /> Project (geologist <br /> T <br /> Walls— <br /> P.E. 43139 <br /> 's <br /> + cc: Mr. Chuck Carmel, ARCO Products Company ;f , <br /> 1204minf <br /> 30003.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.