My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0012685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:36:23 PM
Creation date
8/1/2019 10:22:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012685
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> �i <br /> i <br /> 071-00111=1=-111 <br /> 110111 <br /> 90 ME <br /> a <br /> .�4pp/led GeoSysfe�s 4191.E Power lam Road, Sacramento,CA gS82 � <br /> •FREMONT • 131G1 45_�9Q1 <br /> IRVINE u HOUSTON • BOSTON •SACRAMENTO e <br /> CULVER CITY •SAN)p5f <br /> WC)-'<.K PLAN FOR <br /> A SOIL INVESTIGATION <br /> AND VAPOR-EXTRACTION TEST <br /> ARCO Service Station No. 2130 <br /> 7609 North El Dorado Street <br /> Stockton, California <br /> For ARCO Products Company <br /> PMOD UC MON <br /> At the request of ARCO Products Company (.ARCO),Applied GeoSystems, Inc. <br /> (Applied GeoSystems) is submitting this work plan to conduct a soil investigation and a <br /> vapor-extraction test (VET) at ARCO Service Station No. 2130 in Stockton, California. <br /> The purpose of this investigation is to assess soil for possible gasoline hydrocarbons <br /> before the removal of underground gasoline-storage tanks and install three vapor- <br /> extraction wells. This investigation is not in response to a known or suspected release of <br /> gasoline product. This work pian describes our procedures and methods associated with <br /> this investigation. <br /> The work will be performed in accordance with the Tri-Regional Board Staff <br /> Recomm: dations for Preliminary Evaluation and Investigation of Underground Tank <br /> Sites (California Regional Water Quality Control Board, Central Valley Region, 1989); <br /> Appendix A to that document (August 1990); and the Leaking Underground Fuel Tank <br /> Manual (California Leaking Underground Fuel Tank Task Force, 1989), The Site <br /> Mitigation Acknowledgement/Request For Services Form is included in Appendix A to <br /> this work plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.