Laserfiche WebLink
May 1, 1991 <br /> Site Safety Plan AGS 30003-IS <br /> ARCO Station No. 2130, Stockton, California <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. A.such,the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> o Implementing the Site Safety Plan, Company policy, and procedures. <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> o Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority to suspend work any <br /> time he <br /> e finds <br /> Geologist or <br /> that the provisions of the Platt are inadequate far worker safety. Geolag <br /> ealth and Safety Coordinator promptly <br /> Engineer will inform the Project Manager and the H <br /> of deficiencies within the Plan or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of this Plan. <br /> MEDICAL SURVEIILANCE <br /> Applied GeoSystems personnel and subcontractors engaged in project activities must <br /> participate in a medical surveillance program and must be cleared by the examining <br /> physician(s)to wear respiratory protection devices and protective clothing for working h <br /> hazardous materials. 'fie applicable requirements of Title 8,Section 5216,of the a' o is <br /> edmin_istrative Co _dewill be observed. The applicable requirements under 29 CFR 1910.120 <br /> of the federal d inistrative ode will also be observed. <br /> SAFETY AND ORIENTATION MEE"MG <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> work. The meeting will be led by the Project Manager or Staff Geologist or Engineer. In <br /> addition,fit-testing of respiratory protective devices will be conducted as part of the safety <br /> orientation meeting when the use of a respirator may be required. <br /> 2 <br /> AVP1149d GeOSYWIVi"s <br />