Laserfiche WebLink
e <br /> 9W <br /> Site Safety Plan May 1, 1991 <br /> T <br /> ARCO Station No.2130,Stockton, California AVS 30W3-1S <br /> The Health and Safety Coordinator or Branch Safety Officer will explain Applied <br /> GeoSystems' Respiratory Protection Program to each new employee who must wear a <br /> respirator. The employee will be asked whether or not he or she understands the <br /> information provided. If the Company physician has cleared the employee for respirator use <br /> and the Health and Safety Coordinator or Branch Safety Officer has checked the fit of the <br /> respirator then the employee will be issued a respirator. A written record is signed and <br /> dated by the employee and Health and Safety Coordinator or Branch Safety Officer and <br /> kept in the new employee's Safety Record. <br /> WORK ZONES AND SECURM MEASURES <br /> The Project Manager will call Underground Services Alert (USA) and the utilities will be <br /> marked before any drilling is conducted onsite and the borings will be drilled at safe <br /> distances frorz tl►e utilities. The client will also be advised to have a representative onsite <br /> to advise us in selecting locations of borings with respect to utilities or underground <br /> structures. Applied GeoSystems assumes no responsibility for utilities not so located. The <br /> first 5 feet will be hand augered before any drilling equipment is operated. <br /> Each of the areas where the borings will be drilled will be designated as Exclusion Zones. <br /> Only essential personnel will be allowed into an Exclusion Zone. When it is practical and <br /> local topography allows, approximately 25 to 75 feet of space surrounding those Exclusion <br /> Zones will be designated as Contamination Reduction Zones. <br /> Cones,wooden barricades, or a suitable alternative will be used.to deny public access to <br /> these Contamination Reduction Zones. The general public will not be allowed close to the <br /> work area under any conditions. If for any reason the safety of a member of the public <br /> (e.g.. motorist or pedestrian) may be endangered, work will cease until the situation is <br /> remedied. Cones and warning signs will be used when necessary to redirect motorists or <br /> pedestrians. <br /> EXPOSURE MONTMRING PLAN <br /> It is not anticipated that project personnel exposure will exceed the TL,Vs or PELs of the <br /> k materials;however,proper personal protective equipment will be worn while working at the <br /> site. In addition, the work area will monitored using a direct-reading combustible gas <br /> analyzer or an organic vapor meter to detect the concentration of the volatile hydrocarbons <br /> in the ambient atmosphere. <br /> 13 <br /> APP11d9d 000SYVAOMSJ. <br />