Laserfiche WebLink
- <br /> K � _ Ns <br /> saw <br /> w <br /> -�, G. Development of the three monitoring wells and co!!,�ctiuiz of water samples on a <br /> quaterly basis for a period of one year. <br /> 7. Completion of two angle borings under a buried 500 gallon leaded gasoline tank. <br /> 8. Analysis of water samples for BTXE, diesel fuel, and purgeable halocarbon <br /> compounds. Analysis of soil samples for BTXE, diesel fuel,purgeable halocarbons, <br /> and in the case of the angle boruigs, dibromoethane (EDB) and tetraethyl lead <br /> (TEL). <br /> 9. Preparation of Problem Assessment Report (PAR), Final Remedial Plan (FRP), <br /> Quarterly Reports summarizing sampling and analytical results, and this Final <br /> s Report. <br /> ¢ In summary,minor groundwater contamination,acknowledged in the PSR,is now believed <br /> 1 —= to originate up-gradient,perhaps from the dealerships new car washing activity and not as <br /> a result of the underground waste oil tank as initially suspected. <br /> S <br /> 3 <br /> 7 <br /> } <br /> { \__ 3 <br />