My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0012685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:36:23 PM
Creation date
8/1/2019 10:22:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012685
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> rO P may_ ...,„,r • <br /> 4 <br /> fi3 <br /> 4 GROUNDWATER MU�P'L'QFli�TG `vVUL INSTALLATION <br /> Following the completion of the borehole drilling and s impling activities, three of <br /> boreholes were completed at groundwater monitoring wells. Murray & Associa <br /> i = <br /> completed the necessary workplan and obtained the appropriate permits to install <br /> '=` groundwater monitoring wells from the San Joaquin County Department of Hea. <br /> Division of Environmental Health. The three monitoring wells were installed tc <br /> ' completed depth of 25 feet below ground surface. Well completion details and a litholc <br /> ' log of each of the soil borings were presented in the PAR. <br /> Materials used for the construction of the groundwater monitoring well included 2-inch 1 <br /> interior/exterior flush threaded PVC Schedule 40 casing and well screen. Well scr+ <br /> perforations were precision machine slotted;screen slot sizes were 0.02 inches. Fifteep_f <br /> of well screen was installed into each boring, followed by 10-feet of blank casing. A s; <br /> M pack was placed so that it extends about 2 feet above the uppermost perforations. <br /> well was then sealed with a 2 foot bentonite pellet plug and grouted to the surface v <br /> a mixture of neat cement and 5 percent bentonite. Each well was completed nearly fl <br /> with the surface and enclosed within a subsurface locking christy box. Each well was <br /> x equipped with a locking pressure cap to avoid the possibility of vandalism. Failovs <br /> completion of the wells the location and elevation of each well was surveyed relative tc <br /> established benchmark. The elevation of the water le was subsequently determines <br /> subtracting the depth to water from the elevation of the top of the casing. As a result <br /> direction of groundwater movement and relative gradient has begin determined. Figur <br /> shows the approximate elevation of the water table and the direction of groundw� <br /> movement. <br /> r 7 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.