Laserfiche WebLink
Proposed At <br /> A Sparge <br /> • B-2/MW-1 Monitoring Point (projected) B-3/VW-1 <br /> 0 <br /> CL <br /> I SM �j' ML i E)PLANATI <br /> 5 I <br /> 10 ———R—^ Approximate Contact <br /> 15 I I ® Depth To Ground Water <br /> I I <br /> I20 ML i Monitoring Well Screened installed <br /> 25 _ SM Mw-1 Monitoring well 1 <br /> VW-.1 Vapor Extraction Well i <br /> 30 I TD Total Depth of Boring <br /> I i ML Silt, silt with and, silt and trace sand, <br /> silt trace clay <br /> 30 ML <br /> $ i I SM Silty sand <br /> i <br /> SW Sand fine to medium grained <br /> 35 <br /> • 1 CL Clay I <br /> O 4 <br /> t±; 40 I <br /> 3 � <br /> � I 1 <br /> m <br /> 50 SM <br /> i Sm <br /> I Vadose Zane Y---^-- ---Y <br /> 55Monitor pipe ML <br /> ML Ground Water f 10 <br /> —.---�---Y ---monitorSiLe------------------ f <br /> 60 ----------------- <br /> TD 5 <br /> Sw <br /> 65 <br /> 0 5 10 <br /> 70 4 ------�—Y APPROXIMATE SCAL]PLATE TD ML in feet <br /> GEOLOGIC CROSS SECTION A=A'ARCO Service Station No. 2150 <br /> 7906 North EI Dorado street <br /> FILE No Stockton, California <br /> PROJECT NO-30003 0003G4A <br />