Laserfiche WebLink
1 <br /> February 14, 1992 � A <br /> ARCO Service Station No 2130, Stockton, California <br /> 1 <br /> _o Install a maximum of six conductor casings in the former tank cavity to allow <br /> soil borings to be drilled between the new tanks at a later date, if necessary <br /> o�o Collect and analyze one sample of native soil every 20 linear feet below the <br /> former product lines <br /> o Submit soil samples to a State-certified laboratory for analysis of TPHg and <br /> BTEX according to SJCPHS-EHD guidelines <br /> o Forward laboratory analysis reports of soil samples collected from the former <br /> L tank cavity and the former product lines to the SJCPHS-EHD, and obtain <br /> bI authorization to install new tanks in the former tank cavity and new product <br /> lines in the former product-line trenches <br /> o Collect four soil samples from each 50 cubic yards of stockpiled soil to be <br /> composited in one sample in the laboratory_and__analyzed for TPHg and <br /> BTEX If hydrocarbons are detectedk�?if will be aerated before di osa <br /> o Prepare a report summarizing tank removal operations and our findings, <br /> . conclusions, and recommendations for ongoing work <br /> i <br /> FIELD PROCEDURES <br /> Safetv Plan <br /> Our Site Safety Plan dated May 1, 1991 was submitted to the SJCPHS-EHD in our May 17, <br /> 1991 work plan The Site Safety Plan describes the basic safety requirements for the tank <br /> removal at the work site The safety plan is applicable to personnel of RESNA and to <br /> subcontractors of RESNA The RESNA geologist will act as the Site Safety Officer for the <br /> tank removal Personnel at the site will be informed of the contents of the site safety plan <br /> before work begins A copy of the plan will be kept at the work site and will be available <br /> for reference by appropriate parties during the work <br /> 30003-4w 8 <br />