Laserfiche WebLink
February 14, 1992 �� <br /> . ARCO Service Station No 2130, Stockton, California <br /> i <br /> OBTAINING APPROVAL FOR TANK INSTALLATION <br /> With ARCO's approval, laboratory results and a map showing sample locations will be <br />' provided to the SJCPHS-EHD to expedite the installation of the new underground storage <br /> tanks and product lines and the installation of piping for a VES The layout of the VES will <br /> be based on results of our December vapor-extraction test These tasks will be conducted <br />' after the SJCPHS-EHD receives the laboratory reports and approves the work <br /> REPORT PREPARATION <br /> Within 3 months of completing the field work, RESNA will submit to ARCO a report <br /> summarizing our field methods, laboratory procedures, laboratory results, conclusions and <br /> our plans for further work to delineate the lateral and vertical extent of residual <br /> hydrocarbons Information gathered will be considered confidential and released only with <br /> authorization of ARCO <br /> PROJECT PERSONNEL <br /> Mr Richard H Walls, a Registered Civil Engineer (P E No 43139) in the State of <br /> California, will be in charge of the project Ms Eloise Cherven , Protect Geologist, will <br /> manage field and office operations RESNA employs a staff of engineers, geologists, and <br /> technicians whose services will be used to see the project through to completion <br />• 3IM3-4w 11 <br />