My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009910
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:38:12 PM
Creation date
8/1/2019 10:26:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009910
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 14, 1992 �� <br /> . ARCO Service Station No 2130, Stockton, California <br /> i <br /> OBTAINING APPROVAL FOR TANK INSTALLATION <br /> With ARCO's approval, laboratory results and a map showing sample locations will be <br />' provided to the SJCPHS-EHD to expedite the installation of the new underground storage <br /> tanks and product lines and the installation of piping for a VES The layout of the VES will <br /> be based on results of our December vapor-extraction test These tasks will be conducted <br />' after the SJCPHS-EHD receives the laboratory reports and approves the work <br /> REPORT PREPARATION <br /> Within 3 months of completing the field work, RESNA will submit to ARCO a report <br /> summarizing our field methods, laboratory procedures, laboratory results, conclusions and <br /> our plans for further work to delineate the lateral and vertical extent of residual <br /> hydrocarbons Information gathered will be considered confidential and released only with <br /> authorization of ARCO <br /> PROJECT PERSONNEL <br /> Mr Richard H Walls, a Registered Civil Engineer (P E No 43139) in the State of <br /> California, will be in charge of the project Ms Eloise Cherven , Protect Geologist, will <br /> manage field and office operations RESNA employs a staff of engineers, geologists, and <br /> technicians whose services will be used to see the project through to completion <br />• 3IM3-4w 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.