1 <br /> The laboratory analytical data for the aerated soil stockpiles was provided to BFI Following <br /> approval by BFI, the aerated soil stockpiles were removed from the Site by Dillard and <br /> transported to the BFI Class III landfill. Removal of the soil from the Site was completed on <br /> ' November 15, 1993. A total of about 920 cu. yds. of soil was transported from the Site to the <br /> BFI landfill Disposal documentation for all soil removed from the Site is included in <br /> ' Appendix C. <br /> ' 6.0 INSTALLATION OF VAULT BOXES AND REMEDIATION PIPING <br /> ARCO plans to implement a vapor extraction and air sparge system to remediate the petroleum <br /> hydrocarbons in the soil and ground water at the Site. RESNA Industries of Rancho Cordova, <br /> California (RESNA) is in the process of designing a soil and ground water remediation system <br /> ' for the Site To reduce future trenching across the Site, vault boxes and horizontal piping <br /> associated with the remediation system were installed by Triangle concurrently with the <br /> installation of the new product tanks and piping <br /> Vault boxes were installed over existing wells and at the proposed locations of future wells <br /> (Figure 4) Piping and conduits for vapor extraction, ground water recovery, and air sparging <br /> ' were installed from the vault boxes to the proposed remediation compound location As-built <br /> drawings showing vault box and piping details are available from RESNA. The piping will <br /> allow for connection of the wells to treatment systems in the future <br /> 7.0 SUMMARY OF RESULTS <br /> This section summarizes activities related to UST and piping replacement, soil sampling <br /> analytical data, soil disposal, and installation of remediation piping at the Site <br /> ROWC-4S90CIATESy INC. 7 Doc #A158WO1 17 <br />