My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009930
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:11:58 PM
Creation date
8/1/2019 10:32:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009930
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 23 Standard Operating Procedures <br /> Health and Safety Plans <br /> 2.0 HEALTH AND SAFETY PERSONNEL DESIGNATIONS <br /> Office Health and Safety Manager <br /> The Office Health and Safety Manager (OHSM) assures that the policies and procedures of the <br /> HASP are implemented by the SHSM The OHSM is responsible for providing the appropriate <br /> monitoring and safety equipment and other resources necessary in implementing the HASP. The <br /> OHSM ensures that all personnel designated to work on-site are qualified according to applicable <br /> EPA, OSHA and state requirements <br /> Site Health and Safety Manager <br /> The Site Health and Safety Manager (SHSM) will be present on-site during the conduct of field <br /> operations, will be responsible for health and safety activities and has the authority to make all <br /> health and safety related decisions The determination of hazard levels will be made by the <br /> SHSM in consultation with the OHSM The SHSM has stop-work authorization which he or she <br /> will execute upon determination of an imminent safety hazard, emergency situation, or other <br /> potentially dangerous situation, such as detrimental weather conditions Authorization to proceed <br /> with work will be issued by the OHSM in consultation with the Principal Manager (PM) after <br /> such action The SHSM or PM will initiate and execute all contact with emergency facilities <br /> and personnel when this action is appropriate <br /> ROUX ASSOCIATES HASP 4193 7905 North F3 Dorado Strect <br /> Stockton.Californre <br />
The URL can be used to link to this page
Your browser does not support the video tag.