My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009939
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:15:50 PM
Creation date
8/1/2019 10:34:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009939
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l 0 SEQUOIA ANALYTICAL <br /> 1900 Bates Avenue * Suite LM • Concord California 94520 <br /> (415) 686-9600 0 FAX (415) 686-9689 <br /> Applied GeoSystems (Sacramento) Client Project ID Arco#2130-90-1/Stockton <br /> 4191 E Power Inn Rd <br /> Sacramento, CA 95826 <br /> Attention Eloise Frick OC Sample Group 106-0609 A-D Reported Jun 27 1991 <br /> QUALITY CONTROL DATA REPORT <br /> ANALYTE <br /> Total Lead <br /> Method EPA 7421 <br /> Analyst N Herrera <br /> Reporting Units mg/kg <br /> Date Analyzed Jun 26, 1991 <br /> OC Sample# 1060609 A D <br /> Sample Conc 0 049 <br /> Spike Conc. <br /> Added. 0 010 <br /> Conc. Matrix <br /> Spike, 0 056 <br /> Matrix Spike <br /> %Recovery. 70 <br /> Conc. Matrix <br /> Spike Dup 0 057 <br /> Matrix Spike <br /> Duplicate <br /> %Recovery* 80 <br /> Relative <br /> %Difference' 18 <br /> 46alfty Assurance Statement All standard operating procedures and quality control requirements have been met <br /> SEQUOI4ANALZAL %Recovery Conc ofM S -Conc of Sample x 100 <br /> ��MaJerstein <br /> � Spike Conc Added <br /> Relative%Difference Conc of M S -Conc of M S D x 100 <br /> of (Conc of M S + Conc of M S D)/2 <br /> -_.Project Manager 1D60603APS <7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.