Laserfiche WebLink
- <br /> EXPLANATION <br /> @MW--4 Block wall 1!w-io0 Monitoring well <br /> v (<50/<0.5) Remediation <br /> -� equipment vw-'O*� � Vapor extraction well <br /> a MW-3 r t <br /> -� (<50/<0.5p ; k '�-�- Air sparge well <br /> -N - h1 vw—s <br /> rol- VW-2 }-- ; , - - Sparge monitoring well <br /> mw" e E Destroyed well <br /> I"4W-7 0 STATION - Vapor extraction/air <br /> �(<50/<0.5) n Dispenser BUILDING � sparge piping trench <br /> v ;c <br /> ISIGndso <br /> Underground storage tank <br /> Li <br /> o Conductor casing <br /> +vw-7 <br /> VW 10 i yyy-8 VW-11 ; (350/07) Concentration of total <br /> -6 ; petroleum hydrocarbons <br /> (<200/3.0) , �- T- ^' as gasoline (TPHG) and <br /> O MW-5 ' ' benzene in groundwater, <br /> L----- vw-4 Vw 3 1 O1 l; measured in parts per <br /> -----` I IAS-2 } IAS-3 I i MW-2 billion (ppb); samples <br /> AS-1 MS-2 r~IS-3 I 4 } <br /> 1310/28) collected on 2/5/9fi <br /> MW-1 O11 1 <br /> (230/2.5) - �i }�t ®\, - <br /> MS-1 ` � •_-- 1 vw-12 N5 Not sampled <br /> vw-1 <br /> VW-9 <br /> (RMW <br /> Sidewalk Driveway 130/<0.5) <br /> li <br /> HAMMER LANE <br /> (NS) <br /> MW-80 <br /> G <br /> MW-10 0 O MW_9 Source: Base modlfled from drawing <br /> (350/07) provided by RESNA. <br /> ARCO PRODUCTS COMPANY FIGURE NO. <br /> ARCO SERVICE 6'TATION NO. 2130 <br /> 06E m c o n SCALE: 0 30 60 FEET 7906 N. EL ;DORADO STREET <br /> STOCKTONi CALIFORNIA <br /> PROJECT NO. <br /> GENERALIZ D SITE PLAN 805-114.04 <br />