My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009944
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:28:07 PM
Creation date
8/1/2019 10:36:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009944
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Date June 17, 1996 <br /> ARCO QUARTERLY STATUS REPORT <br /> Facility No 2130 Address 7906 EI Dorado Street, Stockton, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person —EMCON/Jay R Johnson <br /> Consultant Project No 20805-114 006 <br /> Primary Agency/Regulatory ID No Mike Infurna San Joaquin County Public Health Services <br /> WORKED PERFORMED THIS QUARTER (First- 1996) <br /> 1 EMCON performed quarterly groundwater sampling <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> 3 EMCON conducted routine operation and maintenance of the remediation system <br /> 4 EMCON collected air samples from the soil vapor extraction (SVE) system on a monthly basis to <br /> monitor system performance <br /> 5 EMCON evaluated system performance <br /> • 6 EMCON completed and submitted an addendum to the problem assessment report <br /> WORKED PROPOSED FOR NEXT QUARTER (Second- 1996) <br /> 1 ARCO will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for May 1996 <br /> 2 EMCON will attempt to improve benzene destruction efficiency <br /> 3 EMCON will conduct routine operation and maintenance on the remediation system <br /> 4 EMCON will monitor and optimize the performance of the remediation system <br /> 5 EMCON will collect air samples from the remediation system for laboratory analysis on a quarterly <br /> basis <br /> 6 EMCON will obtain a permit from the San Joaquin County Public Health Services to abandon well <br /> MW-8 EMCON will contract a licensed well driller to drill out monitoring well MW-8 using <br /> 10-inch-diameter augers The well will be drilled out to an approximate depth of 75 feet below ground <br /> surface, and the well casing, filter pack, and surface seal will be removed The former well location <br /> will be grouted to ground surface using neat cement <br /> SAON\PJM805\08051140 6AS-95\gb 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.