My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009947
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 11:44:35 AM
Creation date
8/1/2019 10:37:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009947
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Kyle Christie Project 0805-114 04 <br /> December b, 1995 <br /> Page 5 <br /> performance history is currently being reviewed and evaluated The system will be restarted <br /> after the destruction efficiency problem has been corrected <br /> ACTIVITIES PERFORMED DURING THE THIRD QUARTER <br /> • EMCON observed the drilling of four soil borings and the installation of two vapor <br /> extraction wells (VW-11 and VW-12) and two air sparge wells (AS-2 and AS-3) Results <br /> of this investigation will be presented in an addendum to the PAR <br /> • EMCON performed quarterly groundwater monitoring <br /> • EMCON compiled and evaluated groundwater monitoring data <br /> • EMCON connected the new vapor extraction and sparge wells to the remediation system <br /> on August 29, 1995 <br /> • EMCON conducted routine operation and maintenance of the remediation system <br /> • EMCON collected air samples from the SVE system to monitor system performance <br /> • EMCON conducted source testing to reestablish the destruction efficiency <br /> ANTICIPATED WORK <br /> • ARCO will continue to perform quarterly groundwater monitoring The next sampling <br /> event is scheduled for November 1995 <br /> • EMCON will complete and submit an addendum to the PAR <br /> • Based on the telephone conversation with SJCPHS, on November 6, 1995, SJCPHS <br /> requested the well abandonment of well MW-8 EMCON will prepare a workplan to <br /> abandon well MW-8 <br /> • Manufacturer will correct system problem <br /> • EMCON will restartremediation system <br /> • EMCON will conduct routine operation and maintenance on the remediation system <br /> • EMCON will monitor and optimize the performance of the remediation system <br /> • EMCON will collect air samples from the remediation system for laboratory analysis <br /> sACW\PJM805\08051140 4Es-95\pas 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.