Laserfiche WebLink
Mr Kyle Christie Project 0805-114 04 <br /> August 7, 1995 <br />' Page 2 <br /> additional remedial wells were required and should include additional air sparge wells, a <br /> monitoring air sparge well, and vapor extraction wells Residual hydrocarbons were detected in <br /> soil to groundwater (approximately 60 feet below ground surface [bgs]) near the existing tanks, <br />' but only relatively low concentrations were detected in soil samples collected from the other <br /> on-site borings Gasoline hydrocarbons were not detected in the off-site soil borings Dissolved <br /> hydrocarbons have been detected in all wells Total petroleum hydrocarbons as gasoline <br />' (TPHG) concentrations have ranged from less than 10 parts per billion (ppb)to 18,000 ppb, and <br /> benzene concentrations have ranged from less than 0 3 ppb to 2,500 ppb. <br />' Based on the FRP, RESNA proposed the installation of a combined S VE and AS system to <br /> remove gasoline hydrocarbons from soil and groundwater beneath the site The system <br /> consists of a 100-standard-cubic-foot-per-minute catalytic oxidizer equipped with a <br /> 7 5-horsepower vapor extraction blower <br />' In September 1994, EMCON observed the final installation of the remediation system The <br /> system consists of an air sparging-enhanced SVE system with catalytic oxidation treatment <br /> (i.e., AIREX KATOX 100). In November 1994, the system was started up The system <br /> was shut down in February 1995 due to the catalyst malfunction The catalyst was replaced <br /> and the system was restarted in April 1995 <br />' Based on a letter from San Joaquin County Public Health Services (SJCPHS) dated August 29, <br /> 1994, the County requested an addendum to the PAR be submitted outlining remedial <br /> alternatives and further assessment activities necessary to delineate hydrocarbons north and <br /> south of the site. EMCON submitted three access agreement forms to the property owner <br /> north of the site and did not receive a response However, based on a mseetmg conducted on <br /> May 16, 1995, between SJCPHS, ARCO, and EMCON, SJCPHS concluded that the additional <br />' monitoring well north of the site was not necessary at this time Because relatively low <br /> concentrations of benzene have been detected in water samples collected from monitoring well <br /> MW-10 during the last four quarters (highest concentration of 0 9 ppb, and the hydrauhc <br /> gradient has been consistently toward the east to southeast, it is EMCON's opinion that a <br /> monitoring well south of monitoring well MW-10 (laterally cross-gradient) is not warranted at <br /> this time <br /> During the second quarter 1995, EMCON began preparation of a workplan to install <br /> additional remediation wells After approval of the workplan from SJCPHS, the wells will <br /> ibe installed during the third quarter 1995 <br /> SAC/N\pj0Q805N08051140 4cs-95 pas 1 <br /> i <br />