Laserfiche WebLink
it Kyle Christie Project 0805-146 01 <br /> November 14, 1994 <br /> Page 3 <br /> SITE REMEDIATION <br /> During September 1994, After obtaining authority to construct from the San Joaquin Valley Unified <br />' Air Pollution Control District the final installation of the soil vapor extraction groundwater remediation <br /> system was completed <br /> WORK IN PROGRESS <br /> ARCO has authorized EMCON to perform start up of the soil vapor extraction groundwater <br /> remediation system Start up is tentatively scheduled for November 1994 Access agreements were <br /> mailed to Mr and Mrs Cheam (property owner north of the site) on October 24, 1994 Once ARCO <br /> has received authorization to drill on the property, a workplan outh nmg additional assessment activities <br />' will be submitted to the San Joaquin County Public Health Services as well as necessary permit <br /> application ARCO will continue to perform quarterly groundwater morutormg The next sampling <br /> event is scheduled for the month of December 1994 <br /> CONCLUSIONS <br /> Hydrocarbon concentrations continue to fluctuate ria groundwater underlying the site The <br /> groundwater flow direction was flowing towards the east-northeast which is generally consistent with <br />' past data. <br /> DOCUMENT DISTRIBUTION <br />' We recommend that copies of this report be forwarded to <br /> Mr Michaellnfurna <br /> San Joaquin Public Health Services <br /> P O Box 2009 <br />' Stockton, California 95201 <br /> Ms Elizabeth Thayer <br />' California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> SAC/PlUM05\08051460 1 BL94/ifc 4 <br />