My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009954
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 11:37:23 AM
Creation date
8/1/2019 10:54:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009954
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working to Restore Nature <br /> instrumentation diagram The majority of the Plans and Specifications preparation has been <br /> completed <br /> 662 Construction and Operation Permits <br /> An Authority to Construct and Permit to Operate application has been obtained from the <br /> San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) to allow for <br /> construction and installation of the proposed VES. A complete set of plans has also been <br /> submitted to the City of Stockton Building, Planning and Fire Departments for review, <br /> comment, and approval prior to construction and installation of the VES_ <br /> 6.33 Construction and Construction Inspection <br /> Following approval of the FRP, obtaining City Building, Fire and Planning Department <br /> permits and SJVUAPCD air permit to construct, ARCO will initiate system installation in <br /> accordance with the approved Plans and Specifications Construction will include <br /> installation of vapor extraction wells VW-11 and VW-12, air sparge wells AS-2 and AS-3, <br /> and sparge monitoring point MS-4, completion of wellhead piping connections to these <br /> wells, pressure testing of lines, construction of the remediation compound, connection of <br /> electrical service and installation and plumbing of all process equipment (blower and off-gas <br /> abatement system) related to the VES and air sparge system <br /> 6_4 System Startup and Operation <br /> After completion of system installation, we will begin operation of the proposed VES and <br /> air sparge system Start-up procedures will include system monitoring, maintenance, and <br /> sampling within the first 5 days of operation Operation and maintenance of the system as <br /> described above typically includes daily site inspections for the first 5 days of operation, and <br /> site visits once every week for the first month After the first month of operation, site visits <br /> 30003-13 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.