Laserfiche WebLink
AAr <br /> B-2/MW-1 8-17/AS-1 B--19/MS-2 B-20/MS-3 B-3/VW-1 } <br /> a _ ItXPLAN ATI ON- <br /> CL �� CL CL CL MW-1 Monitoring Well <br /> 4 <br /> 5 — L--- VW-1 Vapr Extraction Well <br /> SM j MS-1 Sparge Monitoring Well <br /> 10 ----------- T.D. Tot � depth of Boring <br /> ML Cla y Silt, Silt Some Clay <br /> 15 ML CL Clay Silty Clay <br /> za I <br /> ML SM SiltSand <br /> i <br /> SW Sand, Fine— To Coarse--Grained <br /> t ? Sp Sand, Fine—Grained <br /> 25 —SW <br /> ? <br /> as <br /> ML ML <br /> 35 ML ML <br /> Screened Interval <br /> a <br /> m <br /> M 40 <br /> a <br /> 45 <br />' <br /> 50 ML <br /> 6aML <br /> —7 ML <br /> Sz <br /> ---------------- <br /> 65 = .� — _ <br /> SW <br /> 74 SM <br /> 0 5 10 <br /> 75 ?-------- ------------`�- _____" _ ------��� ---g-------------_----_--? APPROXIMATE SCALE <br /> ML <br /> ML ML in fleet <br /> GEOLOGIC CROSS SECTION A-A' PLATE <br /> ARCO Service Station No. 2130 <br /> 7906 North El Dorado street 3 <br /> FILE No Stockton, California <br /> PROJECT NO.30003 0003G4A <br />