My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009956
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:06:52 PM
Creation date
8/1/2019 10:55:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009956
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date December 29, 1997 <br /> ARCO QUARTERLY STATUS REPORT <br /> Facility No 2130 _ Address 7906 EI Dorado Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-114 008 <br /> Primary Agency/Regulatory ID No Mike Infurna, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Third 1997) <br /> 1 EMCON performed routine quarterly groundwater sampling and monitoring In addition, EMCON <br /> collected groundwater samples from vapor extraction wells VW-1, VW-7, VW-8, and VW-12 at the <br /> suggestion of the San Joaquin County Public Health Services (SJCPHS) <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> 3 EMCON conducted routine operation and maintenance of the remediation system, including routine <br /> operation and maintenance of the air sparge system <br /> �} 4 EMCON collected air samples from the soil vapor extraction (SVE) system to evaluate system <br /> performance <br /> 5 EMCON monitored the dissolved oxygen (DO) levels In groundwater to evaluate the performance of <br /> the air sparge system <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 1997) <br /> 1 ARCO will continue to perform routine quarterly groundwater monitoring The next sampling event Is <br /> tentatively scheduled for November 1997 <br /> 2 EMCON will collect DO and other data to evaluate natural biodegradation at the site <br /> 3 EMCON will pulse the remediation system and will continue to monitor and optimize the performance <br /> of the remediation system <br /> 4 During system operation, EMCON will collect air samples from the remediation system for laboratory <br /> analysis <br /> Current Phase of Project Remediation <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring _ Quarterly___ <br /> Sampling Date _August 19, 1997 <br /> •� Is Free Product (FP) Present on Site No <br /> FP Recovered This Quarter N/A <br /> SAC\N\P3Q\0805V08051140 8CS-97Tcbell 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.