My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009958
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:21:30 PM
Creation date
8/1/2019 10:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009958
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� <br /> t� <br /> Date _ June 12, 1997 <br /> ARCO QUARTERLY STATUS REPORT <br /> Facility No 2130 Address 7906 EI Dorado Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person EMCON/Jay R Johnson _ <br /> Consultant Project No 20805-114 008 <br /> Primary Agency/Regulatory ID No Mike Infurna San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (First 1997) <br /> 1 EMCON performed quarterly groundwater sampling <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> 3 EMCON conducted routine operation and maintenance of the remediation system <br /> 4 EMCON conducted routine operation and maintenance of the air sparge system <br /> 5 EMCON collected air samples from the soil vapor extraction (SVE) system on a quarterly basis to <br /> . evaluate system performance <br /> 6 EMCON monitored the dissolved oxygen levels in groundwater to evaluate the performance of the <br /> air sparge system <br /> 7 EMCON evaluated the remediation system performance <br /> WORK PROPOSED FOR NEXT QUARTER (Second 1997) <br /> 1 ARCO will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for June 1997 <br /> 2 In addition, the vapor extraction well heads will be modified to allow access for groundwater <br /> measurement and sampling Groundwater samples will collected from vapor extraction wells VW-1 <br /> VW-7, VW-8, and VW-12 ' <br /> 3 EMCON will continue air sparging while monitoring the effect of sparging of dissolved hydrocarbon <br /> concentrations in groundwater <br /> 4 EMCON will conduct routine operation and maintenance on the remediation system and will continue <br /> to monitor and optimize the performance of the remediation system <br /> 5 EMCON will collect air samples from the remediation system for laboratory analysis on a quarterly <br /> basis <br /> SAON\PJ"805\08051140 8AS 97Tprz 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.