My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009965
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:55:33 PM
Creation date
8/1/2019 10:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009965
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> 1 <br /> I� I L'.jf r IT Corporation <br /> A, 39.39 Cambridge Road, Suite 220 <br /> _ Cameron Park, CA 9568.E-9007 <br /> Tel 530 676 6884 <br /> } , i�_ i I i Fax 530 676 6885 <br /> the r ^ y <br /> ® ®up ` A", I! 0 P11 I. 10 A Member of The IT Group <br /> li <br /> January 5, 2000 <br /> Project 791612 00010000 <br /> Mr Paul Supple <br /> ARCO Products Company <br /> P 0 Box 6549 <br /> Moraga, California 94570 <br /> Re Quarterly Groundwater Monitoring Report, Third Quarter 1999, for ARCO Service Station <br /> No 2130, Located at 7906 North El Dorado Street, Stockton, Calitornia <br /> Dear Mr Supple <br /> Pinnacle Environmental Solutions, a member of The IT Group (Pinnacle), is submitting the <br /> attached report which presents the results of the third quarter 1999 groundwater monitoring and <br /> sampling program at ARCO Products Company (ARCO) Service Station No 2130, located at <br /> 7906 North El Dorado Street, Stockton, California In addition, operation and performance <br /> details of the remediation system are presented The quarterly monitoring program is in <br /> compliance with the San Joaquin County Public Health Services requirements regarding <br /> underground storage tank investigations The performance of the remediation system is in <br /> compliance with the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) <br /> permit requirements <br /> LIMITATIONS <br /> No monitoring event is thorough enough to describe all geologic and hydrogeologic conditions of <br /> interest at a given site If conditions have not been identified during the monitoring event, such a <br /> finding should not, therefore, be construed as a guarantee of the absence of such conditions at the <br /> site, but rather as the result of the scope, limitations, and cost of work performed during the <br /> monitoring event <br /> Please call if you have questions <br /> Sincerely, <br /> Pinnacle <br /> Joel fman Mark Capps, R G 6561 <br /> ` ProJec Manager Project Geologist <br /> CP\E\ARC0121301QTRLY1213OQ299 DOC-98%g <br />
The URL can be used to link to this page
Your browser does not support the video tag.