My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009968
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:32:23 PM
Creation date
8/1/2019 10:59:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009968
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, 51%.%j r-t UUUt„cs t.Ompany :i <br /> Drvi of AtlantICRIChlieldCompany Task Order No / <br /> ARCO Facility n /�^ <br /> City �+hal� Custody <br /> (J Facility) Consultant <br /> Hager <br /> ARCO engineer Consultant Laborato name <br /> / Telephone no Z Telephone no <br /> ARCO / Consultant x no <br /> Consultant name ZB^ <br /> resConsultant (0 28- <br /> Adds Contract mbar <br /> Consultant <br /> Matrix Preservation [ / r <br /> ethod of shipment <br /> 0 CDE o© � `❑ <br /> O G OI p1 o mQ @e y �N <br /> G , Soil Water Other Ica Acrd S ❑ <br /> - a o E <br /> 0 LU <br /> m� mw ice av r-w T m" <br /> x w w <br /> p <br /> Jr / J ecial delechon <br /> G SY `,/ /` ) I LlmrUreporiing <br /> 4,.�P�d <br /> t43 S ,s�ro� ifs <br /> 05) Speclal OA—/QC <br /> i I S'Sp <br /> {, r <br /> Remarks <br /> z�-7-7- -2z9 as <br /> s� <br /> Lab numbar <br /> Turnaround time <br /> :ondition of sample Priority Rush <br /> lelinquish d bDate <br /> Temperature received i Business Day ❑ <br /> y sem <br /> Time Received by d��F$ Rush <br /> n <br /> Date CIYY __ 1-111 y 2 Business Days ❑ <br /> Time Received by <br /> 1 � � 01rio Expedited <br /> aelinquished by Date Time ce 5 Business Days Ely!a r Dale Time <br /> Standard <br /> Istributlon White co Lfr -I(� �00 10 Business Days <br /> pY—Laboratory Canary copy -ARCO Environmental Engineering, Pink copy—Consultant <br /> PPC 3292(2 91) <br />
The URL can be used to link to this page
Your browser does not support the video tag.