Laserfiche WebLink
Ott � <br /> groundwater gradient and direction of groundwater flow (southeast) were also generally consistent with <br /> previous data Groundwater elevation increased approximately 4 63 feet from the previous sampling <br /> event (November 1997) <br /> The oxygenates, tertiary butanol, MTBE, di-isopropyl ether, ethyl tertiary butyl ether, and tertiary amyl <br /> methyl ether were analyzed for wells MW-1, MW-3, MW-4, MW-6, MW-7, and MW-10 using USEPA <br /> Method 8260 No oxygenates were detected in the samples from wells MW-1, MW-3, MW-4, MW-6, <br /> MW-7, and MW-10 (see Table 2) Due to non-detect analytical results for oxygenates using <br /> USEPA 8260 for all wells, Pinnacle, on behalf of ARCO, requests no further analysis for oxgenates with <br /> the exception of MTBE using only USEPA Method 8020 <br /> Pinnacle shut down the SVE system on November 24, 1997, due to low sod vapor concentrations and is <br /> currently pulsing the system on a periodic basis The SVE system remained shut down during the first <br /> quarter 1998 A cumulative amount of 25,184 pounds of TPHG have been removed since commencing <br /> SVE activities (see Table 5) Figures 4 and 5 present the rate of TPHG concentration over time and <br /> extraction rate and cumulative mass of TPHG removed over time, respectively <br /> The air sparge system was shut down on November 24, 1997, along with the SVE system to evaluate <br /> feasible remediation alternatives Based on data and remediation techniques evaluation, the air sparge <br /> system was restarted on January 20, 1998, and operated at a low flow rate for bubbling and oxygen <br /> addition to the groundwater The addition of oxygen into the groundwater will help to promote <br /> biodegradation of petroleum hydrocarbons in impacted groundwater at the site As a result of air <br /> bubbling in air sparge wells AS-1, AS-2, and AS-3, since January 1998, dissolved oxygen levels in <br /> monitoring wells MS-1(s), MS-2(s), MS-3(s), and MW-2 have increased significantly as shown in Table 6 <br /> Pinnacle will continue to monitor the effects of SVE system pulsing and air bubbling during the second <br /> quarter 1998 <br /> ATTACHMENTS <br /> Table 1 Groundwater Monitoring Data <br /> • Table 2 Groundwater Analytical Results for Oxygenates <br /> • Table 3 Operational Uptime Information of the Sod Vapor Extraction System <br /> + Table 4 Flow Rates and Results of Air Sample Analyses <br /> • Table 5 Extraction and Emission Rates <br /> • Table 6 Air Sparge/Air Bubbling Flow Rates and Dissolved Oxygen Levels <br /> • Figure 1 Site Location Map <br /> • Figure 2 Generalized Site Plan <br /> • Figure 3 Groundwater Contours(March 4, 1998) <br /> • Figure 4 TPHG Concentration Vs Time <br /> • Figure 5 Extraction Rate and Cumulative Mass of TPHG Removed Vs Time <br /> • Appendix A Sampling and Analysis Procedures <br /> • Appendix B Chain-of-Custody Records and Laboratory Analysis Records <br /> • Appendix C Operation and Maintenance and Groundwater Monitoring Field Data Sheets <br /> cc Elizabeth Thayer, California Regional Water Quality Control Board <br /> Bruce Tuter, San Joaquin Valley Unified Air Pollution Control District <br /> SAC�N\PJM80"8051140 9AS-981pzusmer 1 <br />