My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009972
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:08:52 PM
Creation date
8/1/2019 11:01:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009972
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1• <br /> il? <br /> I` <br /> DateFebru 9 <br /> _ ary 19, 19 8 <br /> ARCO QUARTERLY STATUS REPORT <br /> Facility No 2130 Address 7906 El Dorado Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person EMCON/Jay_R Johnson <br /> Consultant Project No 20805-114 008 <br /> Primary Agency/Regulatory ID No Mike Infurna, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Fourth 1997) <br /> 1 EMCON performed routine quarterly groundwater sampling and monitoring <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> 3 EMCON collected air samples from the soil vapor extraction (SVE) system in compliance with the <br /> SJVUAPCD Permit-to-Operate <br /> 4 EMCON conducted routine operation and maintenance of the remediation system during the first half <br /> of the fourth quarter 1997 EMCON shut down the SVE system due to low influent soil vapor <br /> concentrations and high supplemental fuel costs The system will be pulsed periodically <br /> 5 EMCON monitored the dissolved oxygen (DO) levels in groundwater to evaluate natural <br /> biodegradation <br /> WORK PROPOSED FOR NEXT QUARTER (First 1998); <br /> 1 ARCO will continue to perform routine quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for February 1998 <br /> 2 EMCON will collect DO and other data to evaluate natural biodegradation at the site <br /> 3 The SVE system will continue to be pulsed on a periodic basis (once per month, for one week, if <br /> warranted) <br /> 4 EMCON will continue to operate the air bubbling system to increase DO levels at the site The low <br /> flow system will continue to operate on a continuous basis <br /> 5 EMCON will collect and submit air samples for laboratory analyses on a quarterly basis <br /> Current Phase of Project Remediation <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring -Quarterly <br /> . Sampling Date November 19 and 20, 1997 <br /> SAC%N\PHr080S48051140 8DS-97,cbe11 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.