My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009975
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:37:30 PM
Creation date
8/1/2019 11:02:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009975
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOG OF EXPLORATORY BORING <br /> PROJECT NUMBER 0805-114.02 BORING NO B281VW12 <br /> . PROJECT NAME ARCO Products Company Service Station No. 2130 PAGE 4 OF 4 <br /> 13Y D. Foley DATE 8/11/95 SURFACE ELEV --15 ft. <br /> RECOVERY SID PENETRA- <br /> ��,,....'n LITHO- WELL <br /> TION w Q GRAPHIC DESCRIPTION DETAIL <br /> dt' Wy Z: COLUMN <br /> (ft/ft) =M) (btws/ft) L —j N <br /> 10115 <br /> SILT(ML.), continued <br /> 40 <br /> E <br /> SANDY SILT(ML), brown(10YR, 513), 65% low <br /> plasticity fines, 35% fine-grained sand, trace <br /> 10/1 5 iron-oxide staining, very stiff, wet, slight to <br /> moderate hydrocarbon odor <br /> 21 65 <br /> BORING TERMINATED AT 65.3 FEET <br /> i I <br /> I <br /> i <br /> n -T <br /> i 0 <br /> .y I <br /> 75 <br /> I <br /> I <br /> I <br /> I <br /> 80 <br /> RENLnxxs <br /> Honng dulled using 10aach diameter continuous-flight,hollow-sum auger drilling equrpmeat and sampled with a <br /> modified Cahfortua split-spoon sampler Boring converted to a 4-inch diameter vapor extraction well Sae Well <br /> Details street for well construction information <br /> E ON <br />
The URL can be used to link to this page
Your browser does not support the video tag.