My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009976
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:18:09 PM
Creation date
8/1/2019 11:04:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009976
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date August 9, 2002 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2130 Address 7906 EI Dorado Street, Stockton, California <br /> ARCO Environmental Engineer Paul Sample <br /> Consulting Co/Contact Person URS Group, Inc 1 Vern Elarth <br /> Consultant Project No U2130-01-4 <br /> Primary Agency/Regulatory ID No Mike Infurna, an Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER(Second 2002) <br /> 1 Groundwater samples were collected from monitoring wells MW-1 through MW-7 Well MW-10 is still <br /> paved over <br /> 2 Groundwater monitoring data was compiled and evaluated <br /> 3 Continued to inject ambient air at low flow rates into selected wells <br /> WORK PROPOSED FOR NEXT QUARTER(Third 2002) <br /> 1 Stratus will continue to perform routine quarterly groundwater monitoring on behalf of ARCO The <br /> next sampling event is tentatively scheduled for September 2002 <br /> 2 Groundwater samples from monitoring wells MW-1 through MW-7 and MW-10 (if accessible) will be <br /> collected and analyzed for total petroleum hydrocarbons as gasoline (TPHG) and for benzene, <br /> toluene, ethylbenzene, and total xylenes (BTEX) using U S Environmental Protection Agency <br /> (USEPA) Method 8015/8020 DHS LUFT, and for methyl tertiary-butyl ether (MTBE), tertiary-butyl- <br /> alcohol (TBA), di-isopropyl ether (DIPE), ethyl tertiary butyl ether (ETBE), and tertiary amyl methyl <br /> ether(TAME) using USEPA Method 8260 <br /> 3 Continue air bubbling of ambient air at low flow rates into select wells <br /> 4 If paving work in Hammer Lane is completed, efforts will be made to coordinate with Teichert <br /> Construction to reconstruct the wellhead of MW-10 <br /> P IBp-Arco for URS12130%Quarter[y120021Arco_2130_2Q02 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.