My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009979
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:48:37 PM
Creation date
8/1/2019 11:07:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009979
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date February 28, 2002 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2130 Address 7906 EI Dorado Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc /Jay R Johnson <br /> Consultant Project No D000-328-1 <br /> Primary Agency/Regulatory ID No Mike Infurna, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER(Fourth 2009) <br /> 1 Groundwater samples were collected from monitoring wells MW-1 through MW-7 Delta's technician <br /> visited the site to install a monument over well MW-10 below asphalt grade Paving work on Hammer <br /> Lane is still in progress and well MW-10 was not sampled due to inaccessibility <br /> 2 Delta compiled and evaluated groundwater monitoring data <br /> 3 Delta continued to infect ambient air at low flow rates into selected wells <br /> �i WORK PROPOSED FOR NEXT QUARTER(First 2002) <br /> 1 Delta will continue to perform routine quarterly groundwater monitoring on behalf of ARCO The next <br /> sampling event is tentatively scheduled for February 2002 <br /> 2 Groundwater samples from monitoring wells MW-1 through MW-7 and MW-10 (if accessible) will be <br /> collected and analyzed for total petroleum hydrocarbons as gasoline (TPHG) using U S <br /> Environmental Protection Agency (USEPA) Method 8015/8020 DHS LUFT, and for benzene, toluene, <br /> ethylbenzene, and total xylenes (BTEX), and methyl tertiary-butyl ether (MTBE), tertiary-butyl-alcohol <br /> (TSA), di-isopropyl ether (DIPE), ethyl tertiary butyl ether (ETBE), and tertiary amyl methyl ether <br /> (TAME) using USEPA Method 8260 <br /> 3 Continue air bubbling of ambient air at low flow rates into select wells <br /> 4 If paving work in Hammer Lane is completed, Delta will coordinate with Teichert Construction to <br /> reconstruct the well head of MW-10 <br /> P1APC0121301QTRLY120011Arco_2130_4Q01 doc Delta <br />
The URL can be used to link to this page
Your browser does not support the video tag.