My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009982
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:19:47 PM
Creation date
8/1/2019 11:09:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009982
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> l <br /> Date May 10, 2001 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2130 Address 7906 EI Dorado Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc 1 Jay R Johnson <br /> Consultant Project No D000-328-1 <br /> Primary Agency/Regulatory ID No Mike Infurna, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (First 2001) <br /> 1 Groundwater samples were collected from monitoring wells MW-1 through MW-7 and MW-10 and <br /> submitted for laboratory analysis <br /> 2 Delta compiled and evaluated groundwater monitoring data <br /> 3 Delta installed a new air compressor and began air bubbling of ambient air at low flow rates into <br /> selected wells <br /> CIO4 Conducted optimization, operation, and maintenance of treatment system <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2001) <br /> 1 Delta will continue to perform routine quarterly groundwater monitoring on behalf of ARCO The next <br /> sampling event is tentatively scheduled for June 2001 <br /> 2 Groundwater samples from monitoring wells MW-1 through MW-7 and MW-10 will be collected and <br /> analyzed for total petroleum hydrocarbons as gasoline (TPHG) using U S Environmental Protection <br /> Agency (USEPA) Method 8015 and for benzene, toluene, ethylbenzene, and total xylenes (BTEX), <br /> and methyl ternary-butyl ether (MTBE) tertiary-butyl-alcohol (TBA), di-isopropyl ether (DIPE), ethyl <br /> tertiary butyl ether(ETBE), and tertiary amyl methyl ether (TAME) using USEPA Method 8260 <br /> 3 Continue air bubbling of ambient air at low flow rates into select wells <br /> 4 Operation and maintenance of air bubbling system <br /> Current Phase of Project Mon itoring/Re_m_ediation _ <br /> Frequency of Groundwater Sampling All Monitoring Wells_Quarterly _ <br /> Frequency of Groundwater Monitoring Quarter) <br /> Sampling Date March 15, 2001 <br /> Is Free Product(FP)Present on Site No <br /> FP Recovered This Quarter NIA <br /> Cumulative FP Recovered to Date NIA <br /> C 1ARC0121301QTRLY1200112130 Q101 doe Delta <br /> 5110101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.