My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:25:55 PM
Creation date
8/1/2019 11:10:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009983
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> ti <br /> r <br /> l <br /> r <br /> �— Block wall I <br /> MW-4 q <br /> v (-22 63) ter_ Remediation LEGEND <br /> equipment <br /> MW-3 a MW-1 MONITORING WELL LOCATION <br /> Qr VW-1 VAPOR EXTRACTION WELL LOCATION <br /> {-22 62) ® AS-i AIR SPARGE LOCATION <br /> I <br /> MS-1 SPARGE MONITORING WELL LOCATION <br /> r-� VW-5 I MW-8 DESTROYED WELL LOCATION <br /> (j VW-2 I (-2259 GROUND WA'T'ER ELEVATION IN FEET ABOVE MEAN SEA LEVEL <br /> --------- `-� r Vapor extraction <br /> cn i r i piping (Typ) —{-22 70}-.- WATER TABLE CONTOUR IN FEET ABOVE MEAN SEA LEVEL <br /> --� #NFERRED DIRECTION OF GROUND WATER MOVZMENT <br /> I <br /> MW-7 x r STATION WELLS EASURED ON 12/19/00 <br /> r ' BUILDING I <br /> (-2247) Dispenser <br /> j Islands <br /> ` ] I <br /> I <br /> h i <br /> �1ry <br /> I I <br /> t r I Qi -7 <br /> �-----QVW-70 � <br /> VW-8 I <br /> O VW- 1_ Q VW-6 <br /> 01� o i (-22 58) <br /> 40 `! ,a MW-5 <br /> vw-4---- - -3 AS-2 AS-3 i I` <br /> L----------------- — <br /> { A® i i MW-2 <br /> S-2 MS-3 i � I <br /> MW-1 r I {-22 73) <br /> I D 0012 ft/ft <br /> (-2259) <br /> J2�60� _-Q VW-12 <br /> VW-1 <br /> ro ------------ -J <br /> ��ry1 QQ VW- <br /> Sidewalk �� 1 Dr, way MW-ti <br /> t ` �(-22 84) f <br /> North <br /> ryry � <br /> I h I <br /> I � � <br /> I <br /> I <br /> HAMMER LANE I <br /> O 30 FT <br /> SCALE <br /> FIGURE 2 <br /> i MW-6 GROUNDWATER ELEVATION CONTOURS <br /> r 4th QUARTER 2000 <br /> ARCO SERVICE STATION 2130 <br /> 1 <br /> ' 7906 NORTH ELDORADO <br /> Mw-10 0 ■MW-9 1 STOCKTON CALIFORNIA <br /> (-22$2) I PROJECT <br /> D0Q07 3 8 DS8 <br /> M L 1/8/01 A <br /> FILE NO{ PREPARED BY Delta e l i r� <br /> D000;288 M L L Gl <br /> d REVISION NO REVIEWED 8Y Eniltrorrmsntal <br /> 1 4 Consultants, Inc, <br />
The URL can be used to link to this page
Your browser does not support the video tag.