My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009984
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:01:15 PM
Creation date
8/1/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009984
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 i <br /> I <br /> Block wall <br /> MW-4 <br /> (-2701) _ Remedlatran LEGEND <br /> 0 <br /> equipment <br /> r' MW-1I MONITORING WELL LOCATION <br /> MW-3 �+ VW--1 VAPOR EXTRACTION WELL LOCATION <br /> (-27 04) ® AS-1 AIR SPARGE LOCATION <br /> F <br /> i <br /> AMS-1 SPARGE MONITORING WELL LOCATION <br /> j- VW-5 i MW-8 f DESTROYED WELL. LOCATION <br /> QQ VW- i i (-2691)1 GROUND WATER ELEVATION IN FEET ABOVE MEAN SEA LEVEL <br /> r----- -------- Vapor extraction _ <br /> piping {TYP [-27 0]T WATER TABLE CONTOUR IN FEET ABOVE MEAN SEA LEVEL <br /> w i i ) <br /> E -0 INFERRED DIRECTION OF GROUND WATER MOVEMENT <br /> I <br /> F I <br /> STAInIO <br /> MW-7 BUILDING, WELLS MEASURED ON 9/28/00 <br /> (-2686) !\ i l\ Dispensers <br /> I P. <br /> CP I I I I <br /> I I <br /> � I V <br /> r- a�--- VW-10 1 ' -7 <br /> I <br /> I <br /> -�VW-8 <br /> VW 11 QQ VW 6 N <br /> r-----1 <br /> o I (--26\95 i i i p1 <br /> Q5 MW-5 <br /> W-4 V -3 ® AS-2 AS-3i <br /> --- ------------ ------- <br /> (/) ® ® A I i MW-2 t <br /> 'i AS-1 S-2 MS-3 i i (-2705) I <br /> is MW-1 <br /> (-Z6 91) MS 1 I <br /> -1 I----- + VW-12 }'S <br /> --- , <br /> O VW I <br /> I <br /> Sid walk Driveway MW-6 <br /> (-27 06)- <br /> North <br /> t <br /> I <br /> f <br /> 00011 ft/ft I <br /> ] 0 30 FT <br /> HAMMER NE <br /> I <br /> t <br /> r SCALE <br /> FIGURE 2 <br /> ■Mw-8 GROUNDWATER ELEVATION CONTOURS <br /> 3rd QUARTER 2000 <br /> I ARCO SERVICE STATION 2130 <br /> I 7906 NORTH ELDORADO <br /> MW-10 ■MW-9 STOCKTON CALIFORNIA <br /> (-2690) PROJECTfNO DRAWN BY <br /> 0000-328 M L 15/00 Delta <br /> FILE NO I PREPAREDD 8Y <br /> D0003288 M L R/IAREVISION INO REVIEWED BY environmental <br /> 1 firConsultants, Inc. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.