My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0009991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:44:14 PM
Creation date
8/1/2019 11:15:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009991
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Paul Supple, ARCO #2130 page 2 <br /> 7906 N EI Dorado St , Stockton <br /> i <br /> The only time the SVE wells were groundwater sampled was in May 1997 and petroleum <br /> concentrations were high EHD will require all wells associated with this site (i e MW, <br /> VW, MS, AS etc)with groundwater in them to be sampled and analyzed for petroleum <br /> and oxygenates This is to begin at the next quarterly sampling event and continue until <br /> changes are approved by EHD <br /> Based on the information from these wells, ARCO is to evaluate the need to install <br /> additional wells to adequately monitor the groundwater or extract vapors <br /> Additionally, MW-10 has been reported as "inaccessible" since September 12, 2001 <br /> Hammer bane road construction activities have been concluded for some time now and <br /> still the well has not be located, repaired, or monitored as required by EHD Please take <br /> immediate steps to find and return this well to active status If the casing is beyond <br /> repair or is now in a location that does not allow for safe monitoring and sampling, <br /> please provide a work plan in a timely manner to destroy and replace it <br /> This site entered into active remediation before many regulatory investigative changes <br /> for underground storage tank (UST) sites were enacted Most of the changes since <br /> 1994 have provided responsible parties and regulatory agencies with better methods to <br /> characterize, evaluate, and remediate releases associated with leaking USTs <br /> One of the most helpful and useful requirements is the preparation and updating of the <br /> Site Conceptual Model (SCM) This document provides for an in-depth modeling of the <br /> subsurface and is added to as additional information and data is obtained it is very <br /> useful in understanding the petroleum impact and transport and allows for a detailed <br /> design of any needed remedial system ARCO is to provide a SCM for this site In <br /> addition to the latest groundwater analytical data collected from all the wells at this site, <br /> the SCM should provide you with a better picture of the subsurface and the areas of the <br /> site in need of further investigation or remediation <br /> You may contact Michael infuma at (209) 468-3454 if you have any questions or wish to <br /> discuss this letter <br /> Donna Heran, RENS, Director <br /> ;Enviro ental Health D n <br /> G�A 1 <br /> Michael J Infurn Jr , Senior REHS Margaret Lagono, REHS _ <br /> LOP/ Site Mitigation Unit IV Supervisor <br /> MI/ <br /> • c CVRWQCB— Marty Hartzell, Sacramento <br /> c SWRCB—CUF -- Mark Owens, Sacramento <br /> c ,Stratus Env --Jay Johnson 3330 Cameron Park Dr, #550, Cameron Pk, 95682 <br /> c URS Corp —Vern Elarth 2870 Gateway Oaks Dr, #300, Sacramento, 95833 <br />
The URL can be used to link to this page
Your browser does not support the video tag.