My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0010001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:30:57 PM
Creation date
8/1/2019 11:19:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010001
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date- October 27,2004 <br /> Quarter 34 Quarter,2004 <br /> i <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2130 <br /> Address 7906 North EI Dorado Street, Stockton, CA <br /> ARCO Environmental Engineer _Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466468 OL058 <br /> Primary Agency San Joaquin County Environmental Health Division <br /> (SJCEHD) <br /> Assembly Bill 681 Status _Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Third 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling from site wells <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> I <br /> 3 Continued to infect ambient air at Iow flow rates into well VW-10 <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> • 3 Continue bubbling of ambient air at low flow rates into well VW-l0 <br /> 4 Complete required well vault repairs <br /> QUARTERLY RESULTS SUMMARY (Third 2004): <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling MW-1 through MW-7, and VW-1 through VW-12, MS-1A, <br /> MS-1 B, MS-2A, MS-2B, MS-3A, and MS-3B sampled <br /> quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present onsite No <br /> Current Remediation Techniques Natural attenuation/Air bubbling <br /> Approximate Depth to Groundwater 47 38 to 49 60 feet below ground surface (bgs) <br /> Groundwater Flow and Gradient Northeast @ 0 002 feet/foot (ft/ft) <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results,and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following limitations <br /> • The reported results for benzene and toluene in sample MS-IB, tert-butyl alcohol (TBA) and 1,2- <br /> dichloroethane (1,2-DCA) in sample MW-3, and for gasoline range organics (GRO) in samples VW-1 <br /> and VW-8 may be biased high as demonstrated by a high surrogate recovery due to matrix interference <br /> . • The reported result for toluene in sample MS-3A may be biased high due to a high average percent <br /> recovery reported in the associated LCS analysis <br /> K_1Wpr c ssVS RP ARC0\02130\Quaner1y W4\3 QTR 0412130 GWW 3"doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.