My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0010003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:47:21 PM
Creation date
8/1/2019 11:20:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010003
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date August 9,2004 <br /> Quarter 2nd Quarter,2004 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2130 <br /> Address 7906 North EI Dorado Street, Stockton, CA <br /> ARCO Environmental Engineer _Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466468 OL058 <br /> Primary Agency San Joaquin County Environmental Health Division <br /> (SJCEHD) <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Second 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling from site wells <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Continued to inject ambient air at low flow rates into well VW-10 <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Continue bubbling of ambient air at low flow rates into well VW-I O <br /> QUARTERLY RESULTS SUMMARY (Second 2004): <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling MW-1 through MW-7, and VW-1 through VW-12, MS-1 A, <br /> MS-1 B, MS-2A, MS-2B, MS-3A, and MS-38 sampled <br /> quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present onsite No <br /> Current Remediation Techniques _ Natural attenuation/Air bubbling <br /> Approximate Depth to Groundwater 43 01 to 45 37 feet below ground surface (ft bgs) <br /> Groundwater Flow and Gradient Northwest-Northeast @ 0 001 feet/foot ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Please note that as of April 1,2004,the laboratory has changed the carbon range for gasoline range organics(GRO) <br /> from C6 — CIO to C4 — C12 (to include the oxygenates) The resulting data may be impacted by the potential <br /> inclusion of additional total petroleum hydrocarbons as gasoline (TPHg) and non-TPHg analytes within the revised <br /> carbon range, which may result in a higher reported concentration Where the resulting GRO concentration is based <br /> on a single analyte(i e,a non-TPHg analyte or a single TPI-Ig analyte),the analyte will be identified if possible <br /> g%Wprocess115 BP ARC0\021301Quww1yl2 QTR 6412[30 GWMR 2QO4 doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.