My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0010005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:11:48 PM
Creation date
8/1/2019 11:21:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010005
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4� <br /> .1 Date. January 29,2004 <br /> Quarter- 4t°Quarter,2003 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> FacilityNo 1 <br /> 2 30 <br /> Address 7906 North EI Dorado Street, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466468 OL058 <br /> Primary Agency San Joaquin County Environmental Health Division <br /> (SJCEHD) <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Fourth 2003): <br /> 1 Performed quarterly groundwater monitoring and sampling from site wells MS-313 was not sampled or <br /> monitored due to insufficient water <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Continued to inject ambient air at low flow rates <br /> WORK PROPOSED FOR NEXT QUARTER (First 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> • 2 Prepare and subnut quarterly groundwater monitoring report <br /> 3 Continue bubbling of ambient air at low flow rates into selected wells <br /> QUARTERLY RESULTS SUMMARY (Fourth 2003): <br /> Current Phase of Project Morntorm /Remediation <br /> Frequency of Groundwater Sampling MW-1 through MW-7, and VW-1 through VW-12, MS-1A, <br /> MS-1 B, MS-2A, MS-213, MS-3A, and MS-313 sampled <br /> quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present onsite No <br /> Current Remediation Techniques Natural attenuation/Air bubbling _ <br /> Approximate Depth to Groundwater 40 75 to 42 70 feet below ground surface <br /> Groundwater Flow and Gradient South to Southeast @ 0 0006 to 0 0017 feet/foot ft At <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions,holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries), the data are acceptable as reported by the laboratory <br /> with the following limitations <br /> • The reported results for benzene, ethylbenzene,toluene, and total xylenes in sample VW-10 should be <br /> considered estimated since these results exceeded the instrument calibration range and the sample was <br /> reanalyzed one day outside the U S EPA recommended hold time The data from the reanalysis has <br /> been reported <br /> • <br /> r,%wVmcessUS BP ARC0\0211MQumer1y14 QTR 03\2130 GWMR 4Q03 do Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.