Laserfiche WebLink
I <br /> ARCO / BP WELL MONITORING DATA SHEET <br /> BTS # 051211--BC 1 Station # 2130 <br /> Sampler- lark E Morse Date. <br /> Well I D - Well Diameter: 3 4 6 S <br /> Total Well Depth, Depth to Water: 43, $ <br /> Depth to Free Product Thickness of Free Product (feet): <br /> Referenced to c Grade D.O Meter (if req'd). s HACH <br /> W lE_g DiameterMjIltiviler Well Diameter Multiplier <br /> i <br /> l" 004 4" 065 <br /> 2" 016 6" 147 <br /> 3" 037 Other radius'*0 163 t o`, LIS uV <br /> Purge Method Bader Sampling Method Bailer <br /> Disposable Bailer Disposable Bailer <br /> Positive Air Displacement/ Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> i <br /> Other <br /> Top of Screen if well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> qx X 3 - 13.s Gals <br /> I Case Volume(Gals} Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (mS orµS) Gals Removed Observations <br /> 115�'I `7.45 `7,% 71 4 S <br /> i <br /> l2@S ���t ,S ��z ►3-� <br /> I <br /> Did well dewater? Yes o Gallons actually evacuated I? <br /> Sampling Time IZ!D Sampling Date: 121,$jnv- <br /> Sample I D ZLI.5,213Laboratory. Sequoia <br /> alyzed for GRO BTEX Ethanol Oxygenates(5) 1,2-DCA <br /> IN,P1 <br /> D O. (if req'd) Pre-purge ms/ -5 Post-purge 3 . 1 <br /> 4 R.P (1f req'd): Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />