Laserfiche WebLink
ARCO I BP WELL MONITORING DATA SHEET <br /> 7STS #: 051211-BC 1 Station # 2130 <br /> ampler• lar E Morse Date a-r- <br /> Well I.D 313 Well Diameter. 6 3 4 6 8 <br /> Total Well Depth -1 ,t Depth to Water: q-j,q d <br /> Depth to Free Product: Thickness of Free Product (feet) <br /> Referenced to Grade D O. Meter (if req'd): HACH <br /> Well Diameter Multiplier Well Diameter Multiplier <br /> 1" 004 4" 065 <br /> 2" 016 6" 147 <br /> 3" 037 Other radius2*0163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailer Disposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible-- Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise,the well must be purged <br /> r� — 'S <br /> X � — 1'3. Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp(F) pH (mS or S Gals Removed Observations <br /> mtw <br /> iZTP 6% 1% `7 3 `7olo 13.E �S (Its <br /> Did well dewater? Yes Gallons actually evacuated- l-i-S" <br /> Sampling Time t 00 Sampling Date z I t tri <br /> SaEalyzedfor <br /> 1 D M5- Laboratory Sequoia <br /> GRO 13TEX Ethanol Oxygenates(5) 1,2-DCA <br /> O. (If <br /> Pre-purge mgt Post-purge L� / <br /> O.R P. (1f req'd) Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br /> 1 <br />