Laserfiche WebLink
ARCO / BP WELL MONITORING DATA SHEET <br /> BTS # 051211--BC 1 Station# 2130 <br /> Samplera E Morse Date: Mt ato s" <br /> Well I D. Well Diameter- 2 3 6 S <br /> Total Well Depth- �,q� Depth to Water: uq,-j <br /> Depth to Free Product Thickness of Free Product (feet): <br /> Referenced to- Grade D O. Meter (if req'd) HACH <br /> Well Diameter multiplier Well Dameter Multiplier, Z4 it <br /> 1" 004 4" 065 <br /> 2" 016 6" 147 <br /> 3" 037 Other radius'*0 163 <br /> Purge Method Bailer Sampling Method Bader <br /> Disposable Bailer Disposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> ap of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise,the well must be purged <br /> ��1•� x 5 w 51•- Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp CF) pH (mS or Pe) Gals Removed Observations <br /> DA30 -1-0 -1-t tmW 1J,S <br /> 114 A t0� S4•S <br /> • / %. TTW 1. <br /> Did well dewater? Yes o Gallons actually evacuated .� <br /> S� <br /> Sampling Time. qj Sampling Date: ml 121ov- <br /> Sample I D . mW,3 Laboratory Sequoia <br /> &Lnalyzed for GRO BTEX Edianol oxygenates(5) 1,2-DCA <br /> D O. (if req'd). Pre-purge. mg' --w� Post-purge -3,Z Mg/ <br /> O.R P (if req'd) Pre-purge mV Post-purge rnV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />