Laserfiche WebLink
ARCO 1 BP WELL MONITORING DATA SHEET <br /> TS #: 050911-BC 1 Station.# 2130 <br /> Sampler: ar B Sumrnersett Date: t� ` <br /> Well I.D.: <br /> Well Diameter: 2 3 (9 6 8 � <br /> ' Total Well Depth: :�, Depth to Water: L-4-1 .0i <br /> Depth to Free Product: Thickness of Free Product {feet}: <br /> Referenced to: Grade D.O. Meter (if req'd): l�lACH <br /> W011 D'Ame muftli Well Diameter Multiplier ����� <br /> 1" 0.04 4" 0.65 <br /> 2" 0.16 6" 1.47 607, <br /> V 0.37 Othcr radius'*0.163 <br /> Purge Method: Bailer Sampling Method: Bailer <br /> Disposable Bailer Disposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible Other: <br /> Extraction Pump <br /> Other: <br /> Top of Screen: If well is listed as a no-purge,confirm that water level is below the top <br /> of screen. Otherwise,the well must be purged. <br /> X - � - Gals. <br /> 1 Case Volume(Gals.) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp CF) pH (mS or S Gals.Removed Observations <br /> 3U 4A -1.4 402"1,b <br /> �3 �I 1-3 %,Z,2. <br /> Did well dewater? YesUO <br /> Gallons actually evacuated: 3 <br /> Sampling Time: .0qq0 Sampling Date: a It Zin, <br /> Sample !.D.: 11W _ L� Laboratory: Sequoia <br /> 3 <br /> Analyzed for: GRO BTEX Ethanol Oxygenates(5) 1,2-DCA <br /> D.Q. if req'd): Pre-purge: mgIL Post-purge: Mg/ <br /> ( q �� <br /> O.R.P. (if req'd): Pre-purge: mV Post-purge: mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br /> f <br />